# Izgradnja podatkovnih centara- Junior do Mid Project Manager (troškovi)

- **Company:** MGAC
- **Location:** Fort Wayne, IN
- **Mjesto rada:** Mjesto rada nije navedeno
- **Salary:** USD 110K–140K / godina
- **Razina iskustva:** Junior
- **Područje:** Obrti, graditeljstvo i proizvodnja
- **Države:** Sjedinjene Američke Države
- **Posted:** 2026-10-20
- **Ključne činjenice:** Iskustvo: 3+ god.
- **Job page:** https://hr.rolefalcon.com/job/3995080-data-center-construction-junior-to-mid-project-manager-cost-mgac-fort-wayne

MGAC, tvrtka iz djelatnosti Savjetovanje, agencije i poslovne usluge, ima otvoreno radno mjesto Data Center Construction- Junior to Mid Project Manager (Cost). Lokacija: Fort Wayne, Sjedinjene Američke Države. Svrstavamo ga u područje Obrti, graditeljstvo i proizvodnja. Traži se 3+ god. radnog iskustva. Otvorena radna mjesta tvrtke MGAC na ovoj stranici: 9.

To apply, open the job page above and follow its Apply link to the original posting.

## Slični poslovi

- [Djelatnik/ca za detailing automobila](https://hr.rolefalcon.com/job/49695200-car-detailer-carvana-hudson) — Carvana
- [Nadzornik/ca](https://hr.rolefalcon.com/job/49479313-superintendent-upchurch-united-states-reno) — Upchurch
- [Nadzornik/ca održavanja](https://hr.rolefalcon.com/job/49427674-maintenance-supervisor-hawthorne-residential-partners) — Hawthorne Residential Partners
- [Limar/ica](https://hr.rolefalcon.com/job/49426703-sheet-metal-mechanic-the-copper-river-family-of-companies-warner-robins) — The Copper River Family of Companies
- [Inspektor/ica kvalitete](https://hr.rolefalcon.com/job/49297424-quality-inspector-anduril-industries-waltham) — Anduril Industries
- [Mobilni mehaničar/ka](https://hr.rolefalcon.com/job/49148621-mobile-mechanic-equipmentshare-columbus) — EquipmentShare
- [CNC programer/ka](https://hr.rolefalcon.com/job/48980250-cnc-programmer-1x-hayward) — 1X
- [Tier 1 analitičar/ka produkcijske podrške - analitičar/ka](https://hr.rolefalcon.com/job/48908794-tier-1-production-support-analyst-analyst-icapital-des-moines) — iCapital
