# Izgradnja data centra - Junior do Mid Project Manager

- **Company:** MGAC
- **Location:** New Albany, OH
- **Mjesto rada:** Mjesto rada nije navedeno
- **Salary:** USD 90K–140K / godina
- **Razina iskustva:** Junior
- **Područje:** Obrti, graditeljstvo i proizvodnja
- **Države:** Sjedinjene Američke Države
- **Posted:** 2026-10-26
- **Ključne činjenice:** Iskustvo: 3+ god.
- **Job page:** https://hr.rolefalcon.com/job/43839863-data-center-construction-junior-to-mid-project-manager-mgac-new-albany

Data Center Construction - Junior to Mid Project Manager je otvoreno radno mjesto u tvrtki MGAC, tvrtka iz djelatnosti Savjetovanje, agencije i poslovne usluge. Oglas kao lokaciju navodi New Albany, Sjedinjene Američke Države. Svrstavamo ga u područje Obrti, graditeljstvo i proizvodnja. Potrebno je 3+ god. radnog iskustva. MGAC na ovoj stranici ima otvorenih radnih mjesta: 9.

To apply, open the job page above and follow its Apply link to the original posting.

## Slični poslovi

- [Nadzornik/ca održavanja](https://hr.rolefalcon.com/job/50505088-maintenance-supervisor-weinstein-properties-grand-prairie) — Weinstein Properties
- [Instalater/ka](https://hr.rolefalcon.com/job/50887034-install-plumber-plumbing-systems-inc-psi-gypsum) — Plumbing Systems Inc (PSI)
- [Generalni direktor/ica (pumpe, energija i HVAC)](https://hr.rolefalcon.com/job/50219308-general-manager-pump-power-hvac-equipmentshare-haskell) — EquipmentShare
- [Procjenitelj/ica 2](https://hr.rolefalcon.com/job/50212807-estimator-2-oldcastle-buildingenvelope-denver) — Oldcastle BuildingEnvelope
- [Entry-Level detailer/ica automobila / djelatnik/ca na parkiralištu nakon proizvodnje](https://hr.rolefalcon.com/job/50205097-entry-level-automotive-detailer-lot-attendant-post-production-carvana-haines) — Carvana
- [Senior Project Manager, građevinarstvo](https://hr.rolefalcon.com/job/50205522-senior-project-manager-construction-carvana-tempe) — Carvana
- [Project Manager, građevina](https://hr.rolefalcon.com/job/50205431-project-manager-construction-carvana-tempe) — Carvana
- [Rukovatelj/ica opremom-Np](https://hr.rolefalcon.com/job/50221028-equipment-operator-np-sanmar-internal-west-chester) — SanMar-Internal
