# Izgradnja data centra - Junior do Mid Project Manager

- **Company:** MGAC
- **Location:** Minneapolis,MN
- **Mjesto rada:** Mjesto rada nije navedeno
- **Salary:** USD 90K–140K / godina
- **Razina iskustva:** Junior
- **Područje:** Obrti, graditeljstvo i proizvodnja
- **Države:** Sjedinjene Američke Države
- **Posted:** 2026-11-03
- **Ključne činjenice:** Iskustvo: 3+ god.
- **Job page:** https://hr.rolefalcon.com/job/83651526-data-center-construction-junior-to-mid-project-manager-mgac-minneapolis

MGAC, tvrtka iz djelatnosti Savjetovanje, agencije i poslovne usluge, traži osobu za radno mjesto Data Center Construction - Junior to Mid Project Manager. Lokacija: Minneapolis, Sjedinjene Američke Države. Svrstavamo ga u područje Obrti, graditeljstvo i proizvodnja. Traži se 3+ god. radnog iskustva. Otvorena radna mjesta tvrtke MGAC na ovoj stranici: 9.

To apply, open the job page above and follow its Apply link to the original posting.

## Slični poslovi

- [Proizvodnja II](https://hr.rolefalcon.com/job/83645650-production-ii-sanmar-external-sparks) — SanMar- External 
- [Proizvodnja II](https://hr.rolefalcon.com/job/82850371-production-ii-sanmar-internal-sparks) — SanMar-Internal 
- [HVAC Install Lead](https://hr.rolefalcon.com/job/83651574-hvac-install-lead-moore-home-services-santa-rosa) — Moore Home Services
- [Entry-Level djelatnik/ca za detailing automobila / radnik/ica na parkiralištu](https://hr.rolefalcon.com/job/81986229-entry-level-automotive-detailer-lot-attendant-carvana-charlotte) — Carvana
- [Project Manager u građevinarstvu](https://hr.rolefalcon.com/job/82473169-construction-project-manager-terawatt-infrastructure-miami) — Terawatt Infrastructure
- [Monter/ka za komercijalne objekte](https://hr.rolefalcon.com/job/81520689-commercial-installer-dh-pace-las-vegas-nv) — DH Pace
- [RV mehaničar/ka](https://hr.rolefalcon.com/job/83638851-rv-mechanic-indie-campers-denver) — Indie Campers
- [Tehničar/ka za popravak karoserije](https://hr.rolefalcon.com/job/81448205-auto-body-repair-tech-carvana-plainfield) — Carvana
